Home » Articles » Education » Others Certified Internetworking Expert Exams : 646-589

Others Certified Internetworking Expert Exams : 646-589

The 646-589 Others Engineer(Cisco Lifecycle Services Advanced Wireless(LCSAWLAN)) exam is the 646-589 exam associated with the Others Engineer(Cisco Lifecycle Services Advanced Wireless(LCSAWLAN)) job role.

Pass4sure 646-589 PDF Download

Pass4sure offers free demo for 646-589 exam (Cisco Lifecycle Services Advanced Wireless(LCSAWLAN))

Pass4sure 646-589 PDF download.

Pass4sure 646-589 DEMO

3.One of the activities in the Voice over WLAN Assessment service component of the plan phase involves analysis of the existing WLAN environment. Which one of these choices includes some of the tasks in this activity? A: Verify Device Access Security in the Customer Network, Perform an RF Site Survey, Identify Network Infrastructure Gaps and Remediation Plan.B: Perform Gap Analysis According to Leading Practices, Compare Customer Processes with Operational Leading Practices for WLAN, Identify Legacy Application Integration Requirements.C: Identify Potential Interference Sources in the Designated Band, Determine Noise Floor and Signal Strength, Place Test Access Points in Proposed Locations.D: Analysis of Proposed WLAN System With Respect to Availability, Capacity, Security, and Integration with Legacy Architecture.Correct Answers:  C 4.The Low Level Design and the Site Readiness Assessment report represent two of several documents which are important for completing which two key activities for the Implementation Plan Development service component? (Choose two.) A:Collect and Verify Site-Specific Implementation RequirementsB:Develop Systems Acceptance Test PlanC:Collect and Verify Solution Acceptance RequirementsD:Develop Operational Methods and Procedures for the WLAN SystemE:Develop a Plan To Implement New Operational ProcessesF:Create a Site-Specific Network Implementation PlanCorrect Answers:  A, F 5.Which of these activities comprises the service component of WLAN Site Readiness Assessment (RF Survey)? A: Conduct Customer Site Survey, Perform Site Gap Analysis, Develop Site Requirements Specification Report, Gatherand Verify Customer Network Information, Perform Gap AnalysisB: Collect and Verify Information About Current Operations Support Infrastructure, Identify Customer Support for WLAN, Analyze Customer Operational InfrastructureC: Perform Automated Scan of Ports To Determine Potential Vulnerabilities; Produce Network Map of Devices, Operating System, and Services Being Offered To the Network; Research and Confirm Registration of Target IP Address SpaceD: Execute a Series of System Performance Analyses To Provide a Holistic View of the Converged Network of the Customer, Perform an Infrastructure Audit, Complete Security Review of WLAN InfrastructureCorrect Answers:  A 6.Which service component within the prepare phase helps to increase the chances that the proposed system will meet the customer requirements and expectations? A: Business Requirements DevelopmentB: Technology Strategy DevelopmentC: WLAN Wired Network Integration AssessmentD: High Level Design DevelopmentE: Business Case DevelopmentF: Proof of ConceptCorrect Answers:  F 7.Which service component within the prepare phase identifies solution goals, business drivers and success criteria; assesses the customer business and technical requirements; and includes solution value assessment? A: Business Case DevelopmentB: Business Requirements DevelopmentC: High Level Design DevelopmentD: Technology Strategy DevelopmentE: Proof of ConceptCorrect Answers:  B 8.Assessing the Skills and Knowledge Required to Support the Customer-Proposed WLAN Systems, and Developing Training Requirements for Each Job Role in the WLAN Support Model are some of the activities of which service component in the design phase? A: Implementation Kickoff MeetingB: Staff Plan DevelopmentC: StagingD: Project KickoffE: Implementation Plan DevelopmentF: Migration Plan DevelopmentCorrect Answers:  B 9.Which three of these tasks occur in Incident Management? (Choose three.) A:Define Service Level Requirements and Priority for Each DeviceB:Devise and Recommend Workaround Solution if Means of Resolving Is UnknownC:Correlate and Analyze Symptoms To Determine Probable CauseD:Establish Escalation Notification PlanE:Gather Symptom Information Including Traces, Logs, and EventsF:Populate Ongoing Support Handoff KitCorrect Answers:  B, C, E 10.Which three tasks are executed in the Service Assurance service component within the operate phase? (Choose three.) A:Analyze Process ExceptionsB:Prepare a Service Readiness ReportC:Send Internal and External SurveysD:Review Remediation Plan from Operational AssessmentE:Produce Service Level ReportingF:Record and Classify Requests for ChangeCorrect Answers:  A, C, E

 


About the Author: IT Exam Expert

Related Articles

  • PADI Course London: The No.1 Diving Course London with Great Training
  • A Top 10 Dive School London famous for PADI Courses London
  • Diving Schools London: Learning from PADI Centre London Instructors
  • PADI Centre London from London Diving: The Best Diving Experience
  • The PADI Courses London Certification Basics of London Scuba Diving
  • PADI Course London: London Diving Makes Diving Lessons Fun
  • London Scuba Lessons From Diving Schools London
  • London Diving Certification from a Dive School London
  • Writing And Presenting Your Thesis
  • Online Education Needs Full Discipline
  • http://www.subjext.com